Renovation Updates

October 13, 2019


These are the last pictures of the building before construction begins.


The front of the building

The east side of the building. The silver gate is where the vending machines used to be housed. The recessed part of the right was part of the old cafeteria. When Bender was renovated in 2012, the rest of the cafeteria was demolished to get it away from the original high school building.

East side of the building. This wall was added when part of the cafetria was demolished during the Bender renovation in 2012.

Back of the building